Holiday Inn Guest Entrance Door, Fire Door Plastic Sheet Laminated Door

UL Wood Fire Door SpecificationBrandXunzhongCertificationsUL Filler MaterialRock wool coreFire rated time20/45/60/90 minutesSizeMaximum size is (2530x2530mm) Surface finishUnfinished, primed, natural veneer with PU paint, HPL etc.Frame Depth115mm - 150mmOpening directionSwing Inward / OutwardColorRAL color system could

Featured Products

Holiday Inn Guest Entry Door, Fire-Proof Door Plastic Sheet Laminated Door
UL Wood Fire Door Specification
BrandXunzhong
CertificationsUL 
Filler MaterialRock wool core
Fire rated time20/45/60/90 minutes
SizeMaximum size is (2530x2530mm) 
Surface finishUnfinished, primed, natural veneer with PU paint, HPL etc.
Frame Depth115mm - 150mm
Opening directionSwing Inward / Outward
ColorRAL color system could be customized as well.
AccessoriesLock, handle, hinges, door closer, panic bar and other as requested.
Vision PanelWith or without as requested.
Lite FrameUL listed lite frame.
LouverWith or without as requested.
FeatureFireproof and thermal insulation.
Applicationthe building project, business, home decoration(Office, hotel, church, home, etc.)
PackageInside: PE paper, Outside: double layers carton box and wooden pallets.
MOQ1 Set

Holiday Inn Guest Entry Door, Fire-Proof Door Plastic Sheet Laminated Door
Holiday Inn Guest Entry Door, Fire-Proof Door Plastic Sheet Laminated Door
Holiday Inn Guest Entry Door, Fire-Proof Door Plastic Sheet Laminated Door
Holiday Inn Guest Entry Door, Fire-Proof Door Plastic Sheet Laminated Door
Holiday Inn Guest Entry Door, Fire-Proof Door Plastic Sheet Laminated Door
FAQ
Q1: Are you a manufacturer of fire doors?

A: Yes, we are. Offering excellent and various goods at competitive price is what we have been keeping doing.

Q2: What kind of Certification did you pass?

A: After the relevant institution of professional evaluation, we're qualified for UL, CE, ISO9001, BV, ROHS, etc.
For wooden fire doors, we are qualified for BS-476, EN-1634, UL-10C.

Q3: How can you guarantee your final quality?

A: As for quality control, we've approved four testing procedures: 
Initial inspection, re-inspection, final inspection, and sampling inspection.

Q4: How is the MOQ of required?

A: We welcome any amount under your request. but a competitive price always depends on the quantity increase gradually.

Q5: How long is the production lead time?

A: Usually, T/T 50% deposit to start production, the balance paid before shipping. Lead time about 15-25 days.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours